Fee Schedule :: ANTRIM TOWNSHIP FEE SCHEDULE

AntrimTownship

Fees

(Equipment, Permits, Inspections, Hearings, Subdivision/Land Development)

PERMITS

NEW CONSTRUCTION / ADDITIONS LAND USE PERMITS

Base Amount

Square Foot Rate (Living/Floor Area)

Single-Family Home

$25.00

+

$0.10

Multi-Family Home

$25.00/Unit

+

$0.10

Commercial Facility (Single Unit)

$75.00

+

$0.10

Commercial Facility (Multi Unit)

$50.00/Unit

+

$0.10

Industrial Facility

$100.00

+

$0.10

ACCESSORY STRUCTURE LAND USE PERMITS (Over 100 sq.ft.) Sheds, pools, detached garages, etc.

Base Amount

Square Foot Rate (Floor Area)

Residential

$25.00

+

$0.05

Commercial

$25.00

+

$0.10

Industrial

$50.00

+

$0.10

Pools

$25/Above Ground

N/A

$35.00/In-ground

N/A

Outbuildings (Agricultural Use Only)

$25.00 (1,000 sq.ft.)

+

$2.00/every 1,000sq.ft.

ROAD OCCUPANCY PERMITS

Base Amount

Additional Rate

Residential

$30.00

+

$25.00 each additional

Non-Residential

$50.00

+

N/A

Residential (Bore/Open Cut)

$50.00

+

Inspection Costs

Non-Residential (Bore/Open Cut)

$50.00

+

Inspection Costs



SIGNS

Base Amount

Additional Rate

In-Home Occupation (4sq.ft.)

$25.00

N/A

Commercial

$25.00

+

$1.00/sq.ft. of sign face

Industrial

$25.00

+

$1.00/sq.ft. of sign face

Temporary

$25.00

N/A

SEWER / WATER TAP PERMITS

Base Amount

Inspection Costs

Sewer

$4,854.00

+

$50.00 res. / $75.00 comm.

Water

$1231.00

+

$50.00 res. / $75.00 comm.

SEWER / WATER RATES

Base Amount

Additional Rate

Sewer (per EDU)

$115.50/quarter

N/A

($38.50/month)

N/A

Sewer (Metered Rate)

$8.40/1,000gallons

N/A

Water

$48.22/quarter

+

$6.94/1,000 gallons

INSPECTIONS

SEWER / WATER INSPECTIONS

Base Amount

Additional Rate

Sewer Lateral -Residential

$50.00 /One Time

+

$30.00 each additional

Sewer Lateral -Commercial

$75.00 /One Time

+

$30.00 each additional

Water Service Line - Residential

$50.00 /One Time

+

$30.00 each additional

Water Service Line - Commercial

$75.00 /One Time

+

$30.00 each additional

ATMA Connection to Main Lines

$50.00/hour

+

Materials and Expenses

SEWER / WATER MAIN LINE INSPECTIONS

Base Amount

Additional Rate

Line Construction

$30.00/hour

Minimum 1 hour per visit

Line Inspections

$30.00/hour

Minimum 1 hour per visit

Line Testing

$30.00/hour

Minimum 1 hour per visit

Pump Station

$65.00/hour

Minimum 1 hour per visit

Administrative (reviewing "As-builts" etc.)

$60.00/hour

+

Recording Costs

ROAD CONSTRUCTION INSPECTIONS

Base Amount

Additional Rate

Road Construction

$30.00/hour

Minimum 1 hour per visit

Road Inspections

$50.00/hour

Minimum 1 hour per visit

Administrative (reviewing "As-builts" etc.)

$30.00/hour

+

Recording Costs

SUBDIVISION / LAND DEVELOPMENT APPLICATIONS

SUBDIVISIONS

Base Amount

Additional Rate

Subdivision

$150.00/1st Lot

+

$25.00 Each additional lot

Subdivision with Sewer/Water Construction

$150.00/1st Lot

+

$50.00 Each additional lot

Subdivision with Road Construction

$150.00/1st Lot

+

$50.00 Each additional lot

Subdivision with Sewer, Water and Road Construction

$150.00/1st Lot

+

$75.00 Each additional lot

Final Plan with an approved Preliminary

$100.00/1st Lot

+

$20.00 Each additional lot

Recreation Fee

$500.00 per Lot

Repair & Improvement Charge

$2,068.00 per EDU

LAND DEVELOPMENT PLANS

Base Amount

Additional Rate

Land Development - Residential

$100.00

Land Development - Non-Residential

$200.00 / 1st acre

+

$75.00 each additional acre

Disturbed

All Subdivision plan revisions after the 3rd revision are $25.00 per lot with a maximum charge of $100.00 per revision. All Land Development plan revisions after the 3rd revision (non-residential only) will be $25.00 / acre with a maximum charge of $100.00 per revision.

***WITHDRAWAL FEE OF $20.00 WILL BE CHARGED FOR ALL ITEMS WITHDRAWN FROM THE REVIEW PROCESS***

HEARINGS

ZONING HEARING

Base Amount

Additional Rate

Variance

$700.00

+

Any additional costs incurred

Appeal

$700.00

+

Any additional costs incurred

ZONING CHANGE / CONDITIONAL USE

Base Amount

Additional Rate

Zoning Change

$500.00

+

Any additional costs incurred

Conditional Use

$500.00

+

Any additional costs incurred

Hosted by CTI Networks, Inc.